8.63. In the case of subparagraph b of paragraph 5 of section 8.62, the contractor or owner-builder must obtain a laboratory report attesting to the required permeability and thickness of the soil. A copy of the report must be sent to the owner of the tank to be filed in the register referred to in paragraph 1 of section 8.41.